Analysis Of Supply and Demand Hot Mix Asphalt in The Province Of Lampung
DOI:
https://doi.org/10.35450/jip.v4i01.8Keywords:
hot asphalt (hot mix), Asphalt Mixing Plant (AMP) unit, demand, supplyAbstract
With an increasing need for asphalt about 3.53% annually demand and supply conditions in Lampung Province will not in balanced for some years in the future. Purpose of this research is to study on the increased need for hot asphalt in Lampung Province next few years for a national road project the Ministry of Public Works and Highways provincial road projects of Dinas Bina Marga Lampung Province. While the purpose of this research is the availability of the results of a needs analysis of hot asphalt in Lampung and strategic recommendations to overcome the increase in the future. The percentage of hotmix increasing need in 2014 and 2015 on the project and the National Roads Provincial Roads is 30%. The results of the analysis of needs and the availability of hot mix in 2014 showed that the needs on the ground and the availability of Lampung is still balanced. The results of the analysis of needs and the availability of hot mix in 2015 showed the need for maximum hot mix at the span of the last 5 months AMP production capacity that exceeds the average - average per month. The differences are considerable between the need and availability of hot mix and amounted to 2 times as much and AMP are available are not able to make ends meet in 2018. Asphalt Mixing Plant (AMP) unit in Lampung Province can actually meet the needs hotmix in Lampung Province in 2018 on the assumption of production per year. Hotmix job execution patterns are always held on the last 6 months within the work calendar , making the maximum hotmix requests per month that exceeds the production capacity in AMP per month. This is a problem on AMP s inability to meet all demand maximum hotmix the last 6 months for the next few years. Increased production of hot mix in Asphalt Mixing Plant to be a temporary solution would be difficult to do because of the increasing need Unit Asphalt Mixing Plant ( AMP ), which operates in the province of Lampung is now being used for decades / old. Changes in the pattern of implementation of the work hotmix by service providers who carry out work hotmix at a span of 6 months in a year needs to be done so that the distribution of hot mix into each project can be uneven road annually.
Downloads
References
2004. Manual Pekerjaan Campuran Beraspal 2. Direktorat Permukiman Dan Prasarana Wilayah Direktorat Jenderal Prasarana Wilayah.
2005. Pedoman Pemeriksaan Peralatan Unit Produksi Campuran Beraspal (AMP). Pusat Penelitian dan Pengembangan Prasarana Transportasi Direktorat Permukiman Dan Prasarana Wilayah Direktorat Jenderal Prasarana Wilayah.
2011. Kajian Kebutuhan Dan Ketersediaan Material Dan Peralatan Konstruksi. Kementerian Pekerjaan Umum, Pusat Pembinaan Sumber Daya Investasi.
2015. Laporan Akhir Study Rantai Pasok Campuran Aspal Panas di Provinsi Lampung. Dinas Bina Marga Provinsi Lampung.
2015. Informasi Kegiatan Pelaksanaan Preservasi dan Peningkatan Jalan dan Jembatan Nasional Tegineneng – Kota Agung. Balai Besar Pelaksanaan Jalan Nasional III Satker P2JN. Provinsi Lampung.
2015. Laporan Bulanan 07 Core Team Consultant Wilayah II Tahun Anggaran 2015. Balai Besar Pelaksanaan Jalan Nasional III Satker P2JN. Provinsi Lampung.
2015. Laporan Bulanan 07 Pengawasan Teknis Jalan Kota Bumi – Bukit Kemuning – Padang Tambak Tahun Anggaran 2015. Balai Besar Pelaksanaan Jalan Nasional III Satker P2JN. Provinsi Lampung.
2015. Laporan Bulanan 07 Pengawasan Teknis Jalan Bukit Kemuning – Padang Tambak – Liwa – Jl. Sudirman (Liwa) Tahun Anggaran 2015. Balai Besar Pelaksanaan Jalan Nasional III Satker P2JN. Provinsi Lampung.
2015. Laporan Bulanan 07 Pengawasan Teknis Jalan Bernung – Gedong Tataan – Rantau Tijang, Simpang Tanjung Karang – Tegineneng – Batas Kota Metro II Tahun Anggaran 2015. Balai Besar Pelaksanaan Jalan Nasional III Satker P2JN. Provinsi Lampung.
2015. Laporan Bulanan 07 Pengawasan Teknis Jalan Batas Provinsi Bengkulu – Padang Tampak – Simpang Gunung Kemala – Batas Kota Liwa Tahun Anggaran 2015. Balai Besar Pelaksanaan Jalan Nasional III Satker P2JN. Provinsi Lampung.
2015. Laporan Bulanan 07 Pengawasan Teknis Jalan Biha – Bengkunat – Sanggi Tahun Anggaran 2015. Balai Besar Pelaksanaan Jalan Nasional III Satker P2JN. Provinsi Lampung.
2015. Laporan Bulanan 07 Pengawasan Teknis Jalan Sanggi – Wonosobo – Kota Agung Tahun Anggaran 2015. Balai Besar Pelaksanaan Jalan Nasional III Satker P2JN. Provinsi Lampung.
Direktorat Bina Marga dan Pengairan. 2012. Pengertian Aspal Beton (Hotmix). Diakses pada tanggal 25 Februari 2016.
Natsir, Mochammad. 2012. Sistem Rantai Pasok Material Dan Peralatan Konstruksi Untuk Mendukung Investasi Infrastruktur. Kepala Pusat Pembinaan Sumber Daya Investasi. Badan Pembinaan Konstruksi. Kementerian Pekerjaan Umum. 18 hal.
Sukirman, Silvia. 1999. Perkerasan Lentur Jalan Raya. NOVA. Bandung. 129 hal.
Sutoyo. 1999. Strategi Merancang Pekerjaan Campuran Beraspal Panas (Hotmix) Yang Kuat Dan Awet Dalam Upaya Meningkatkan Kinerja Perkerasan Jalan Yang Handal. Jurnal Ilmiah Dinas Bina Marga. Jawa Timur. 19 hal.
Published
How to Cite
Issue
Section
The Authors submitting a manuscript do so on the understanding that if accepted for publication, copyright of the article shell be assigned to Development Innovation: Jurnal Kelitbangan (JIP) , Balitbangda Provinsi Lampung as publisher of the journal.
Copyright encompasses exclusive rights to reproduce and deliver the article in all form and media, including reprints, photographs, microfilms and any other similar reproductions, as well as translations, the reproduction of any part of this journal, its storeage in databases and its transmission by any form or media. such as electronic, electrostatic and mechanical copies, photocopies, recordings, magnetic media, etc.